2020 Egbin Power Plc Industrial Attachment Program for Undergraduates in Nigeria

Deadline

Deadline: November 24, 2019

EGBIN POWER PLC, Lagos is one of the biggest additions to the electricity industry in Nigeria. Often seen as the biggest single generating power station in subSaharan Africa, it was built to meet the ever-rising demand for electricity in Lagos and its environs. Before the construction of the Egbin Power Plc, Lagos, the Ijora Power Station which is reputed as the oldest power generating plant in the country was the main source of electricity supply around.

Eligibility

The Student should be on Second CLass Upper (2:1) or its equivalent as at the time of submitting the application

Field of Study

Engineering
Applied Industrial Science
Environment Technology
Information Technology
Finance

Duration: January 2020 – June 2020

Application

Click here to apply

Facebook
Twitter
LinkedIn
Pinterest
Change Language »